architectural plan 3d model

🔴 Pink Zone (your mark: building location) 👉 The chosen optimal position for the main school building massing is completely correct. Building layout strategy The building adopts an east–west elongated bar configuration. The primary façade faces inward to the campus (not toward the road). B1 is fully within this zone (civil defense shelter). Ground levels 1–4F are stacked above to form one clear, unified mass. Three advantages of this position It does not cut through the existing campus’s main activity areas. It maintains a relationship with existing buildings that is connectable but non-intrusive. The north/upper side adjacent to the road is ideal for placing back-of-house logistics and the guardhouse in this area. 🟢 Green Zone (your mark: existing buildings) 👉 This is the key advantage for connection design—not a problem. How I would handle it 1️⃣ Spatial connection (soft connection, not rigid attachment) No structural tie-in (to avoid seismic compliance complexity and responsibility/liability is