3D Workspace
Home
Assets
Affiliate Program
Sign up/Log in
?
Upgrade
DCC Bridge
Anonymous1763766469
11-21 23:10
Model Name
soccer field 3d model
Tags
architecture
rendering
realistic
Prompt
1. Concept Overview Mini 5-a-side soccer pitch with full perimeter branding for BTC Smega. Two tower flood lights for night play. Pitch-side giant outdoor LED screen (5 m x 3 m). Event stage, stalls for product demos and food, and organized car parking. “Drone Phone” large-format backdrop behind the stage. 2. Site Plan and Dimensions Pitch: 30 m (L) x 20 m (W), synthetic turf, enclosed boards. Perimeter boards: 1.1 m high, continuous around all sides with BTC Smega branding. Entry/exit gates: two 2 m wide openings located at mid-length on opposite touchlines for player flow and safety egress. Safety apron: 2 m clear zone around all sides for spectators, stewards, and access. 3. Layout Placement LED Screen: 5 m x 3 m, placed parallel to one touchline, centered, set back 3 m from the boards; rear service clearance 1.5 m; viewing distance 8 m minimum. Flood Light Towers: two towers at diagonally opposite corners outside the apron, each set back 4 m from boards; aim fixtures to achieve uniform illumination on the playing surface. Stage: 8 m (W) x 4 m (D) x 1 m (H), positioned opposite the LED screen beyond the apron; accessible ramp at 1:12 slope, backstage storage 3 m deep. Stalls: Smega Onboarding/Help Desk: 4 m x 3 m, near main entrance. Merch & Promo: 3 m x 3 m, beside help desk. Food & Beverage: 6 m x 3 m, downwind side, with queue lanes. Car Parking: 50–60 bays in adjacent lot, with two VIP bays and one loading bay near the stage; pedestrian walkway separated by barriers. 4. Branding and Messaging Perimeter boards: BTC Smega primary brand with call-to-action. Panel content rotation: “Smega Mobile Money — quick, easy transactions anytime, anywhere.” “Open a Smega account with your BTC Mobile number and valid ID.” “Visit btc.bw/smega” “Follow us: facebook.com/btcBW” “BTC SMEGA” logotype repeat at 5 m intervals. Center circle decal: BTC Smega lockup. Corner flags: BTC Smega color palette and icon. Stage backdrop: “Drone Phone” hero image spanning full stage width; integrated BTC Smega message and QR codes to btc.bw/smega and facebook.com/btcBW. LED screen content: live match feed, Smega tutorials, QR sign-up, promotional animations. 5. Technical Specifications Pitch system: FIFA-recommended small-sided synthetic turf; shock pad; line markings for 5-a-side (goal area radius 6 m, center circle radius 3 m). Boards: aluminum frame, composite infill, 1.1 m high; top rail protective padding; mesh netting to 4 m above boards at goal ends. Goals: 3 m x 2 m with rebound panels flush to boards; anchored and padded. Flood lights: two 12 m towers, each with 4–6 LED luminaires (asymmetric sports optics). Target average horizontal illuminance: 200–300 lx; uniformity U1 \ge 0.6. CRI \ge 70; CCT 5000 K; glare control cowls. LED screen: outdoor-rated, 5 m x 3 m, pixel pitch 6–10 mm, 6–8 k nits, front-serviceable; truss or ground-support frame with ballast; content via media server; audio via 2 x 1 kW PA tops plus subs near stage. Power: Lighting: 12–18 kW total. LED screen: 5–8 kW peak. PA and stage: 4–6 kW. Stalls: 2–4 kW. Supply: three-phase 125 A distro with RCD/RCBO protection; cable ramps over walkways. Safety and compliance: 3 m emergency egress corridors; fire extinguishers at stalls and stage; first-aid post near help desk; crowd barriers separating spectators from apron; weather-rated equipment. 6. Operations and Flow Entry: ticketing/registration portal with Smega QR sign-up; stewarded bag check. Player circulation: team warm-up zone outside one goal end; bench areas along touchlines. Spectator flow: perimeter viewing lane with marshals; queue systems for stalls. Content schedule: match blocks, Smega demos, prize moments, influencer Q&A on stage, live drone phone product features. Accessibility: ramps to stage; accessible viewing platform near LED screen; reserved parking bays. 7. Color and Materials Primary brand color on boards and flags; contrasting white type for URLs and call-to-action; reflective strip on board tops for night visibility. Turf: green with white lines; stage decking black; truss in matte black; stalls in branded canopy. 8. Deliverables Schematic plan, elevations, electrical single-line, content schedule, safety plan, and BOM. 9. Copy and On-Screen Messaging Perimeter CTA: “Open your Smega account today with your BTC Mobile number and valid ID.” URLs: “btc.bw/smega” and “facebook.com/btcBW”. Screen loop: Smega how-to, live match highlights, QR codes, drone phone features, prize announcements. $\boxed{\text{Mini soccer pitch and event layout with BTC Smega perimeter branding, two flood lights, 5 m x 3 m LED screen, stage, stalls, car parking, and drone phone backdrop — specified as above.}}$
Detailed Info
Related Models
Enter invite code
Enter invite code to get credits!