3D Workspace
Home
Assets
Affiliate Program
Creator Program
Sign up/Log in
?
Upgrade
DCC Bridge
Anonymous1780554117
06-04 06:24
Model Name
interior construction 3d model
Tags
architecture
rendering
realistic
Prompt
Transition: Image 1 to Image 2 (Active Construction Phase) This is a fast-motion timelapse of structural work and material installation. Workers enter in high-speed, blurred motion and begin cleaning the space. The raw concrete floor from Image 1 is rapidly sheeted for protection. The walls are quickly prepared with new substrate for stone hanging. The massive Nero Marquina marble slabs from the design concept arrive and are cut. A matte black steel ceiling framework is rapidly welded into place, creating visible sparks. Integrated linear lighting channels are cut into the substrate. No faces are visible during this phase
Detailed Info
Related Models
Enter invite code
Enter invite code to get credits!