3D Workspace
Home
Assets
Affiliate Program
Creator Program
Sign up/Log in
?
Upgrade
DCC Bridge
Anonymous1775335517
06-27 05:38
Model Name
aquatic lab 3d model
Tags
aquatic
architecture
architecture concept art
architecture concept art realistic
architecture realistic
concept art
concept art realistic
realistic
swim
Prompt
Create a realistic 3D concept model of a premium aquatic performance warehouse lab. 300–400m² light industrial space, 5m ceiling, grey/black Olympic sports science style. Include five zones: front reception with athlete check-in, lounge, lockers and change rooms; private physio/metabolic clinic with treatment bed, ultrasound station and equipment storage; glass-walled central data hub beside the flume with server racks, desks and large biomechanics/VO2 monitors; dryland gym floor with rubber flooring, force plates, lifting platform, cable columns and swim-tether rigs; centrepiece glass-enclosed swim flume lab with rectangular propulsion flume, blue water, underwater/overhead mocap cameras on rails, starting block, force walls and metabolic mask boom. Add HVAC/dehumidification, soundproof glass, clean lighting, no people, no logos, no readable text.
Detailed Info
Related Models
Enter invite code
Enter invite code to get credits!