
biogas energy system 3d model
Generate a complete industrial 3D energy system composed of separate assets. Every asset must be exported as an independent GLB mesh with clean geometry and hard-surface industrial design. Maintain logical electrical and gas flow alignment. Do not simplify, replace or reorganize the sequence. Do not remove any device. Follow the exact order below. MANDATORY: All assets MUST remain clearly separated with a minimum spacing of 0.5–1.0 meters between units. Do NOT fuse, merge, overlap, or visually combine any equipment. Each asset must be an independent, clearly distinguishable module. IMPORTANT SHAPE RULE: – ONLY the Biogas Storage Tank may be cylindrical. – ALL OTHER ASSETS must remain rectangular and industrial: Purifier, SOFC modules, DC combiner, inverter, UPS, data center, and grid interface. --------------------------------------------------------- ASSET 1 — BIOGAS STORAGE UNIT (CYLINDRICAL, LARGE) --------------------------------------------------------- Large cylindrical industrial biogas storage ta
v3.0-20250812









