3D Workspace
Home
Assets
Affiliate Program
Sign up/Log in
?
Upgrade
DCC Bridge
Anonymous1763417159
11-19 13:36
Model Name
industrial facility 3d model
Tags
architecture
rendering
realistic
Prompt
Generate a high-fidelity industrial 3D model of a Solid Oxide Fuel Cell (SOFC)–biogas power system integrated with a hyperscale data center. Use real-world proportions, engineered alignment, and professional-grade detailing. Create an outdoor industrial platform with compacted soil base, concrete slabs, cable trenches, and landscaped perimeter. Include realistic ground textures and environmental lighting. DATA CENTER (MAIN LOAD) Large-scale rectangular data center building (≥ 35 m long). Exterior elements: HVAC units, ventilation louvers, raised cable trays, maintenance access doors, and power entry room. Add dedicated electrical connection points for incoming DC/AC power lines. SOFC ARRAY (GENERATION ZONE) Place three (3) SOFC modules, each represented as a rectangular containerized system (≈ 7–10 m long), with heat exchanger housings, intake grids, exhaust stacks, and diagnostic access panels. Arrange modules in a linear row with equal spacing and maintenance clearance zones. Apply metallic industrial textures: brushed steel, ceramic-coated exhaust parts, high-temperature insulation. POWER ELECTRONICS (CONVERSION STAGE) Between each SOFC module and the data center, include power converters/inverters (cabinet-type industrial enclosures). Add medium-voltage switchgear housings, DC bus ducts, and grounding systems. Model all cable conduits and trays with precise routing: SOFC → DC conduits → Converters Converters → AC conduits → Data Center Ensure segregated pathways, avoiding overlaps and respecting electrical safety clearances. BIOGAS STORAGE + PURIFICATION SYSTEM Install a large horizontal cylindrical biogas storage tank (≥ 12 m long), mounted on reinforced concrete saddles. Next to the tank, place a biogas purification plant consisting of: Desulfurization tower (vertical vessel) Siloxane removal filters Moisture separator Activated carbon beds Add all interconnecting process piping: Tank → Pretreatment → Purifier → SOFC fuel manifolds Include shut-off valves, flow meters, pressure regulators, and safety reliefs. Pipes must follow structured industrial routing: overhead pipe racks or ground-level insulated conduits. CABLE MANAGEMENT + SAFETY All electrical cables must be routed through labeled cable trays, EMT conduits, and insulated ducts. Avoid free-hanging cables; enforce NEC-compliant separation between power, control, and communication cables. Add grounding rods and bonding straps for the SOFC modules and converters. ADDITIONAL DETAILS Add shadow-accurate lighting, PBR textures (metallic, roughness, emissive), and industrial color coding: Yellow → Process gas Red → Electrical high-voltage Blue → Cooling systems Maintain strict alignment, engineering precision, and clean topology suitable for rendering or VR walkthroughs. Ensure the entire installation appears as a professional, realistic industrial facility
Detailed Info
Related Models
Enter invite code
Enter invite code to get credits!