3D Workspace
Home
Assets
Affiliate Program
Sign up/Log in
?
Upgrade
DCC Bridge
Anonymous1777641548
05-01 13:30
Model Name
industrial piping system 3d model
Tags
machine
rendering
realistic
Prompt
This industrial system uses a multi-tank farm routed through a floor-level valve manifold to four conical hopper stations. **Manifold & Flow Control** The floor array contains three line groups: Hopper, Processing, and CIP Return. Using manual butterfly valves and tri-clamp sanitary fittings, operators route product based on physical labels (e.g., "6번", "7번"). **Routing Logic** * **Hopper 1:** Fed by Valve Group 1 (Tanks 1 & 2). * **Hopper 2:** Fed by Valve Group 2 (Tanks 3, 4, & 8). * **Hopper 3:** Fed by Valve Group 3 (Tanks 5, 6, & 7). Tank 7 is located to the left of Tank 6. * **Hopper 4:** Fed by Valve Group 4 (Tanks 9 & 10). **Discharge** Product enters conical hoppers equipped with centrifugal pumps and a wall-mounted MCC panel to control flow into the final processing lines. /var/folders/wk/yv_9txjn3hv6dbn1lvvpdf4m0000gn/T/IMAGE 2026-05-01 22:30:26.jpg
Detailed Info
Related Models
Enter invite code
Enter invite code to get credits!